• Alexey I. Herzog
    Director general, JSC SibEnergoGroup

    Background:

    Novosibirsk Civil Engineering Institute 1974

    Key projects:

    • Management of construction of the 6th power generating unit at Novosibirsk cogeneration plant – 5;
    • Coordination of works at building cooling tower #3 at Novosibirsk cogeneration plant – 5;
    • Management of construction of ash disposal area #2 at Novosibirsk cogeneration plant – 5;
    • Management of construction of turbounit #14 at Novosibirsk cogeneration plant – 3;
    • Participation in replacing two hydraulic units at Novosibirsk hydropower station;
    • Management of construction of 30-MW turbounit at Barabinsk cogeneration plant;
    • Coordination of works at building power substations “Cheluskinskaya”, “Vympel”, “Frunzenskaya”, “Olovozavodskaya”, “Berdskaya”;
    • Supervision of capital construction and reconstruction of power generating facilities within the limits of investment programs of “NovosibirskEnergo” in Novosibirsk city and Novosibirsk region.

    Awards:

    Honorary power engineer of Russian Federation

  • Grigoriy P. Bashkirtsev
    Deputy Director General (Instrumentation and Control Systems)

    Background:

    Novosibirsk State Technical University

    Key projects:

    • More than 40 projects in the field of instrumentation and control systems in power engineering, communication means, fire alarms at such cogeneration plants and 110-220 kV sub-stations and control centers as the 110-kV sub-stations the Bibliotechnaya, Olovozavodskaya, Gorskaya, Frunzenskaya, and such switching sub-stations as the Bibliotechny and Teplovaya of the JSC “NovosibirskEnergo”
    • Execution of commissioning work package over the instrumentation and control systems at such 110=-kV sub-stations as the Bibliotechnaya, Olovozavodskaya, Gorskaya, Frunzenskaya, and such switching sub-stations as the Bibliotechny of the JSC “NovosibirskEnergo”, and ash disposal area #2 of the Novosibirsk cogeneration plant – 3
    • Management and supervision of the process of execution of works from designing to commissioning of the following:
      • systems of control over 24 long-retracting water soot-blowers at Novosibirsk cogeneration plant – 3 (over 10 years of trouble-free operation)
      • systems of control over short-retracting water soot-blowers at the Imin TPP (China)
      • systems of control over vibrobit devices at the Ust’-Ilim cogeneration plant
      • systems of control over long-, short- and deep-retracting water and steam soot-blowers at the Jerada TPP (Kingdom of Morocco)
      • systems of control over long-retracting water soot-blowers at the AES cogeneration plant (city of Ust’-Kamenogorsk)
    • In the capacity of chief designer, he managed the process of execution of the total work package from development of draft proposal to equipping strategic air forces with automation devices of airborne systems
    • Author of five inventions.

    Inventions:

    • Gauge of distribution characteristics of impulse accidental processes
    • Switching device of electric welding arc
    • Relay outputs protection device of telemechanic systems
    • Diagnostic device in high-voltage oil switches
    • Method of cleaning the boiler’s slagged surfaces
  • Alexadr M. Medvedev
    Deputy Director General (Commissioning)

    Background:

    • Novosibirsk Institute of Water Transport Engineering;
    • Novosibirsk State Technical University;
    • Petersburg Power Engineering Institute of Professional Development (courses for CEOs).

    Key projects:

    • Reconditioning works at Novosibirsk cogeneration plant – 4;
    • Reconditioning works at Novosibirsk cogeneration plant – 2;
    • Reconditioning of local boiler plants (Novosibirsk);
    • Reconditioning of the system of fire extinguishing of fuel supply at Novosibirsk cogeneration plant – 5;
    • Reconditioning of the system of fire extinguishing of duct runs at Novosibirsk cogeneration plants – 2 and 3;
    • Reconditioning of oily waste sewer systems and waste disposal facilities at Novosibirsk cogeneration plants – 2 and 3.
  • Dmitry A. Bobylev
    Head of the feasibility reports development unit

    Background:

    • Novosibirsk State Technical University
    • Petersburg Power Engineering Institute of Professional Development (courses for CEOs)
    • Novosibirsk State of Architecture and Arts (center of professional development)

    Key projects:

    • Assembly and commissioning of the system of automatic regulation and steam distribution of the “-200/210-130LMZ turbine at st.#14 of Novosibirsk cogeneration plant – 5;
    • Assembly and commissioning of the system of automatic regulation and steam distribution of the “-110-130UTMZ turbine at st.#14 of Novosibirsk cogeneration plant – 3;
    • Project of reconditioning of cogeneration plant of the Federal State Unitary Enterprise “Siberian Chemical Combine” within the boundaries of intergovernmental agreement between the Ministry for Atomic Energy of the Russian Federation and the United States Department of Energy;
    • Commissioning, cross-hole and set-up works at newly launched and reconditioned equipment of the cogeneration plant of Federal State Unitary Enterprise “Siberian Chemical Combine” (city of Seversk);
    • Construction of the Zeleznogorsk cogeneration plant;
    • Project of removal of the turbounit at the cogeneration plant of JSC “Chelyabinsk metallurgical combine”;
    • Reconditioning of Novosibirsk cogeneration plant-4.
  • Vasiliy A. Glazyrin
    Head of the experimental development unit

    Background:

    Pavlodar state university named after S. Toraigyzov

    Key projects:

    • Engineer job in development of the project of reconditioning of power generating unit #6 at the Aksu TPP of JSC “Eurasian Power Corporation” with total replacement of all equipment;
    • Designing pipelines in the process of reconditioning the power generating unit # 6 at power station of JSC “Eurasian Power Corporation” in Aksu;
    • Making calculations of pipelines in the process of reconditioning the power generating unit # 2 at power station of JSC “Eurasian Power Corporation” in Aksu;
    • Reconditioning of boilers #1, 2 with next installation of air cooling devices at cogeneration plant-10 (Angarsk);
    • Reconditioning of boiler plants with the purpose of Nox emissions reduction at cogeneration plant-1, cogeneration plant-2, and cogeneration plant-3 of JSC “AlEs”;
    • Designing installation of steam and water soot-blowers at Bratsk and Novo-Ziminsk cogeneration plants of JSC “IrkustkEnergo”;
    • Making calculations of heat dissipation in furnace chambers of boiler plants BKZ-500, BKZ-420, and BKZ-320 types, modeling of combustion processes for cogeneration plants in Novo-Irkutsk, Novo-Ziminsk, and Bratsk.